top of page

PROJECTS

GREEN ENERGY

City of Chico, California Solar Power Generation System at the Water Pollution Control Plant.

 

Design services for electrical interconnection of the solar panels to the plant power distribution equipment, and coordination services to meet the requirements for the solar power system interconnection with Pacific Gas & Electric (PG&E) power grid.

Design review of the Fuel Cell Cogeneration project at the Moreno Valley Regional Water Reclamation Facility, Eastern Municipal Water District, California.

 

Project included design of 1.5 MW fuel cell cogeneration system.

Fuel Cell Cogeneration Project at the Turlock Irrigation District (TID).

 

Design assistance for interconnection of the Fuel Cell Cogeneration System and performed review of the electrical power system for quality assurance and control.

Fayetteville Public Works Commission, North Carolina Cross Creek Water Reclamation Facility Methane Cogeneration Study.

 

This study evaluated the feasibility of installing cogeneration facilities at the Cross Creek Water Reclamation Facility to better utilize the excess digester gas.

WASTEWATER

Lee County North County, Florida Reverse Osmosis Water Treatment Plant Expansion Design Build.

 

Electrical and Instrumentation Design 

 

Collier County, Florida Northeast Water Reclamation Facility and Water Treatment Plant Design.

 

This project involved facility planning; new co-located water and wastewater facilities.

Electrical engineer for the installation and commissioning of multiple lift stations and SCADA evaluation for the City of St. Petersburg, Florida.

 

The project consisted of replacing telemetry for about 80 remote sewage lift stations.

Southwest Water Reclamation Facility Electrical Master Plan and Design of Main Power Distribution Improvements, City of St. Petersburg, Florida.

 

Project included design of 12 kV switchgear, 2 – 2,000 kW – 5 kV generators for standby power, 12 kV-480 volt substation transformers, and underground ductbanks and electrical manholes.

Electrical engineer for the Central County Water Reclamation Facility Phase 2 Expansion and Main Lift Station Upgrade, Sarasota County Utilities Department, Florida.

 

Project included design of an upgrade to the 480 volts power distribution and SCADA system that included an additional 1,000 kVA utility transformer, and a 480 volts switchgear with provisions to synchronize the two generators

Central County Water Reclamation Facility Phase 3 & Phase 4 Expansion, Sarasota County Utilities Department, Florida.

 

Expansion to the 480 volts power distribution system that included additional 480 volts MCCs, an additional 1,250 kW generator with sound attenuation, and with synchronizing controls to run in parallel with the existing 1,250 kW generator, underground ductbanks, pums with variable frequency (speed) controllers, additional power and controls for aeration blowers, and additional new programmable controllers.

Central County Water Reclamation Facility Phase 3 & Phase 4 Expansion, Sarasota County Utilities Department, Florida.

 

Expansion to the 480 volts power distribution system that included additional 480 volts MCCs, an additional 1,250 kW generator with sound attenuation, and with synchronizing controls to run in parallel with the existing 1,250 kW generator, underground ductbanks, pums with variable frequency (speed) controllers, additional power and controls for aeration blowers, and additional new programmable controllers.

bottom of page